One deal room for the contract, the milestones and the money
Every milestone carries an exact value, owner, deadline and evidence checklist. Technical acceptance and finance release are separate decisions by different people. Nothing is released because a timer expires or an AI reviews evidence.
Below: the stages of a contract, an example schedule for each kind of equipment, and a working illustration with a fictional £12,000,000 contract.
- Evidence acceptedReviewer named
- Technical acceptanceApproved
- Finance approvalIn review
- Provider instructionLive release disabled
From award to close, six stages.
Every contract on EnerProcure passes through the same six stages. Each one has a rule the platform enforces, so a contract cannot skip a step.
01Buyer
Award
The winning quotation becomes the first draft of the contract. Prices, quantities and currency carry over exactly as quoted.
Every line is rounded to the currency's smallest unit and the rounding is recorded.
02Buyer and supplier
Terms and schedule
The two sides set the scope, delivery terms, warranties and the milestone schedule: what is paid, when, and on what evidence.
The milestones must add up to the contract value exactly. Every change is a new numbered version.
03Four approvers
Approval
Commercial, legal and finance approve for the buyer, and the supplier accepts. All four are needed on the same version.
Changing the contract after an approval cancels that approval.
04Authorised signatories
Signature
The approved version is sent for signature. The contract is treated as executed only when the signing provider confirms it.
The signed document is matched to the approved version by its fingerprint.
05Supplier, inspector, logistics
Manufacture and delivery
Each milestone is worked through in turn: documents uploaded, checked, technically accepted, then approved for payment by two finance approvers.
Technical acceptance and payment approval are separate decisions by different people.
06Buyer
Acceptance and close
After commissioning and final acceptance the retention is released, the warranty period begins and the record is closed.
The full history stays on the record: every version, document, decision and payment.
A schedule for each kind of equipment, ready to start from.
Battery storage, modules, inverters, transformers, switchgear and control systems are bought differently. Each has its own stages, its own documents and its own point where the money should move. Choose one to see an example.
Example schedule
Battery storage
Containers, power conversion and the energy management system, from signing to a passed capacity test.
On a contract of
- Stages
- 6
- Documents asked for
- 24
- Paid before shipment
- 60%
- Held to the last stage
- 10%
An example for the two sides to change. Each bar is one stage, sized by its share of the contract. Choose a bar to open that stage.
Released when
Every unit passes the agreed factory test, witnessed by the buyer or an independent inspector, and any defects are closed.
Documents to upload
- Factory acceptance test report covering every unitFactory test · Required
- Independent inspection reportInspection · Required
- Capacity and efficiency test resultsTest result · Required
- Serial number list for cells, racks and containersDocument · Required
These schedules are starting points for the buyer and supplier to change, not EnerProcure policy and not legal advice. Figures marked as published come from named industry sources; naming a publisher is not a claim of partnership or endorsement.
One contract, worked through.
A working illustration with a fictional £12,000,000 contract. Try the tabs and open a milestone.
Illustration only. A fictional contract showing how the workspace behaves. No customer records, no provider confirmation, and payments are not activated. Payment percentages are negotiable examples, not policy.
EXAMPLE-0001 · Contract workspace
Grid transformers and switchgear, 120 MW solar and storage site
Supply, factory test, delivery DAP site and commissioning support for four 33/132 kV grid transformers and associated switchgear. Fictional example.
Payment schedule
Payment schedule
£12,000,000.00
The milestones add up to the contract total exactly
Technically accepted
£4,200,000.00
35% of the schedule
- 1
- 2
- 3
- 4
- 5
- 6
- Documents accepted
- 5 of 15
- Awaiting review
- 1
- 1 rejected, to resubmit
- Upload slots open
- 9
- Provider-confirmed funds
- Unconfirmed
Each bar is one milestone, sized by its share of the contract. The lit part is technically accepted.
Illustrative. Real contracts round each line to the currency's minor units and record the rounding adjustment against the raw quoted prices.
Milestones