Launching 2027 · Registration openRegister
AI PROCUREMENT FOR UTILITY-SCALE SOLAR + STORAGE

Energy procurement, under control.

One governed record for buyers, suppliers and logistics, from site and specification to sealed tender, contract and delivery. Governance is the advantage: AI proposes, named people decide, and the record shows both.

Launching 2027 · Registration open Our aimMilestone payments in partnership withCorpay

Demo data
  • Screened, no match
  • Possible match under review
  • Screening pending
  • Sea leg (estimated)

Earth imagery: NASA Blue Marble and Black Marble

Show the demo routes as a table
Demo supply routes (fictional)
PackageFromToSea legScreening
PV modulesEast AsiaDemo 120 MWac solar + BESS site (Iberia)EstimatedScreened, no match
BESS containersNorth AmericaDemo 120 MWac solar + BESS site (Iberia)EstimatedScreened, no match
PV modulesSouth-East AsiaDemo 200 MWac solar site (Atacama region)EstimatedPossible match under review
BESS containersEast AsiaDemo 80 MW / 320 MWh BESS site (Western Australia)EstimatedScreened, no match
PV modulesSouth AsiaDemo 300 MWac solar site (Arabian Peninsula)EstimatedScreening pending
MV transformersCentral EuropeDemo 100 MWac solar site (Northern Cape)EstimatedScreened, no match
PV modulesSouth-East AsiaDemo 150 MWac solar + BESS site (US Southwest)EstimatedPossible match under review
PV modulesSouth AsiaDemo 100 MWac solar site (Northern Cape)EstimatedScreened, no match
Demo data: a fictional network of 8 package routes. Sea legs are estimated, not live positions.
Platform infrastructureISO 27001Information securityCertified by our platform provider
Platform infrastructureSOC 2 Type IISecurity, availability & confidentialityCertified by our platform provider
EnerProcureIn progressISO 27001Information securityCertification in progress. Not held by EnerProcure Limited today.
EnerProcureIn progressISO 9001Quality managementCertification in progress. Not held by EnerProcure Limited today.
EnerProcureIn progressUK GDPRData protectionPrivacy programme under review. Not an independent compliance certification.
EnerProcureIn progressEncryptionProvider-managed in transit & at restEncryption is provided by the hosting platform; EnerProcure is documenting its own controls.
What you can source

Everything a solar and storage site is built from, from the people who make it.

Procurement teams at EPCs, IPPs and developers source every main package through EnerProcure, from modules and batteries to transformers, switchgear and controls. EnerProcure runs the process; the manufacturers supply the equipment.

Swipe to see all 8

Illustrative photography. Index values are from the illustrative demo feed. Windows without an index open the contract schedule for that equipment.

Timeline matching

Set the date. Only those who can deliver get to bid.

When an official RFQ goes live it carries the date the equipment is needed on site. A supplier whose lead time cannot meet that date is not invited and cannot send a quotation. Choose the equipment and move the date to see it work.

Official RFQ, live

Example

Transformers

2

of 6 verified makers
can bid

52 weeksabout 12 months

8 weeks are allowed for shipping. A maker can bid when its lead time plus shipping fits inside the date.

  • Maker A Verified

    Europe · rated 88, outstanding

    Can bid

    48 of 52 weeks

  • Maker B Verified

    Asia · rated 81, strong

    Can bid

    52 of 52 weeks

  • Maker C Verified

    Middle East · rated 74, strong

    Cannot bid

    needs 70 weeks, 18 too many

  • Maker D Verified

    Europe · rated 92, outstanding

    Cannot bid

    needs 88 weeks, 36 too many

  • Maker E Verified

    Asia · rated 66, sound

    Cannot bid

    needs 112 weeks, 60 too many

  • Maker F Verified

    North America · not yet rated

    Cannot bid

    needs 138 weeks, 86 too many

The makers, their lead times and their ratings are examples, and the audit and rating are being introduced. The date rule is the platform's own.

AI, governed

AI proposes. Named people decide.

Governance is the advantage: AI proposes, named people decide, and the record shows both. Every output is advisory, cited and confirmed by a named person.

01Datasheet extraction

Example
p. 2
  • Rated powerp. 2
    580 Wp98%
  • Module efficiencyp. 2
    22.5%96%
  • Temperature coefficientp. 3
    −0.29% per °C71%

One value to check Waiting for a person to confirm

Datasheet extraction

Reads a supplier's PDF datasheet into the typed specification for its category, field by field, with a confidence score and the page each value came from.

Never publishes a spec without a person confirming it in the review queue.

EnerProcure Markets

The market behind every bid, inside the platform.

Module, storage and material prices, the news that moves them and what is shipping, in one place for procurement teams.

EnerProcure indices · should-cost, base 100Illustrative demo feed

Preview. Prices are an illustrative demo feed and the stories are samples.

Site to RFQ · demo

From a site to a structured RFQ, in one pass.

Pick a fictional site and size the plant. The demo drafts the RFQ packages, the evidence each supplier must attach and the screening run before award. Quantities are indicative Example and there are no prices.

Demo inputs

Fictional sites in broad regions. Nothing is saved or sent.

Mounting
Assumptions used
  • 28 modules per string (1500 V class)
  • 3 strings per single-axis tracker; 2 per fixed-tilt table
  • PV inverter stations of 4.2 MWac, each with its own MV transformer
  • BESS DC blocks of 5 MWh usable at beginning of life, each shipped as one 20-ft unit; PCS units of 2.5 MW
  • 620 modules per 40-ft high-cube container
  • No prices: quotations come from invited suppliers

Draft RFQ · demo

Demo site Iberia

Solar DC
125 MWp
BESS energy
200 MWh
Programme threshold
Met
  1. 01PV modules

    201,628 × Modules · 7,201 strings · 326 FEU

    Evidence required

    • IEC 61215 and IEC 61730 certificates
    • PAN file and datasheet for the offered revision
    • Factory audit or inspection plan, with serial-number records
    • CE declaration of conformity

    Screening before award

    • Sanctions screening of the supplier and its owners (OFAC, UK, EU and UN lists)
    • Supply-tier traceability: polysilicon, wafer and cell origin
  2. 02Single-axis trackers

    2,401 × Trackers

    Evidence required

    • Structural calculations for the site wind and snow loads
    • Stow strategy and controller documentation
    • Corrosion protection specification

    Screening before award

    • Sanctions screening of the supplier and its owners (OFAC, UK, EU and UN lists)
    • CBAM scope check for steel and aluminium content
  3. 03PV inverter stations

    24 × Inverter stations · 24 × MV transformers (in stations)

    Evidence required

    • IEC 62109 safety certificates
    • OND file and datasheet for the offered revision
    • Grid-code compliance for the connection country
    • Transformer factory test plan (IEC 60076)

    Screening before award

    • Sanctions screening of the supplier and its owners (OFAC, UK, EU and UN lists)
  4. 04Battery energy storage

    40 × DC blocks · 20 × PCS units · 200 MWh

    Evidence required

    • IEC 62619 and IEC 62933 certificates
    • Nominal and usable energy stated separately, with the degradation basis
    • Fire safety and thermal runaway documentation
    • EMS and SCADA interface description

    Screening before award

    • Sanctions screening of the supplier and its owners (OFAC, UK, EU and UN lists)
    • Supply-tier traceability: lithium, cathode and cell origin
  5. 05Logistics and delivery

    326 FEU · 40 TEU

    Evidence required

    • Port-to-site route survey
    • Delivery slot plan against site readiness
    • Marine cargo insurance

    Screening before award

    • Sanctions screening of the supplier and its owners (OFAC, UK, EU and UN lists)
    • Vessel and carrier screening
Register

Run it on a real site with your engineering team.

Product tour · demo data

One package, 8 stages, one record.

Follow DEMO-PKG-104, a fictional module package, from requirement to close-out. Bidders appear as aliases, as they do to buyers during a sealed tender. Example

Structure requirements

Map sites, packages, bill-of-materials versions, units and evidence requirements before approaching the market.

Demo · DEMO-PKG-104
  • PV modules

    201,628Modules

    7,201 strings326 FEU
    Evidence required4 items
  • Single-axis trackers

    2,401Trackers

    Evidence required3 items
  • PV inverter stations

    24Inverter stations

    24 × MV transformers (in stations)
    Evidence required4 items
  • Battery energy storage

    40DC blocks

    20 × PCS units200 MWh
    Evidence required4 items
  • Logistics and delivery

    326FEU · Module containers to move

    40 TEU
    Evidence required3 items
  • The enquiry so far

    5 packages, 18 evidence items.

    Each package goes to market with its quantities, its units and the evidence a bidder has to supply.

Stage 1 of 8
Capabilities

Eight capabilities, one shared record.

Each step writes to the same record, so a decision taken at tender stays traceable through contract, delivery and close-out.

Tender & bid management

Structured tenders to scoped suppliers, sealed until the deadline, compared like for like.

Supplier verification

EnerProcure vetting and certificate review, kept separate from any payment provider's own checks.

Compliance & traceability

Sanctions and forced-labour list screening, and factory-to-site traceability, recorded with list versions and dates.

Evidence-cited AI

Datasheet extraction and a grounded assistant that cite their sources and abstain when the record cannot support an answer.

Contracts & milestones

Awards become versioned contracts with evidence-based milestone schedules.

Production & inspection

Plans, serial numbers, inspections and substitutions tied to the awarded lines.

Logistics & delivery

Bookings, delivery slots and site receipts, including part, damaged and rejected deliveries.

Document control

Versioned datasheets and certificates shared only with the right organisations.

Fictional £12m contract milestone schedule in the contract workspace
Contracts

A £12m schedule, every step visible.

This fictional example keeps factory evidence, deliveries, dispute holds and approvals against the exact contract version.

Technical acceptance

An engineering reviewer checks the agreed evidence and accepts, rejects or raises a defect.

Finance approval

Separate authorised approvers review the payment request after technical acceptance.

Payment instruction

Sending funds is a separate, final step with the payment partner.

Explore the contract workspace
Milestone-secured payments

Capital moves against evidence, never an assertion.

EnerProcure has partnered with Corpay for milestone payments. Live payments open once the escrow mandate and account set-up are finalised; until then the workspace prepares each step without moving money.

01

Commit

The contract records the intended commitment and checks required before production is scheduled.

02

Hold

The intended provider arrangement maps each prepared instruction to named milestones. Activation terms remain unresolved.

03

Evidence

The supplier or forwarder submits the evidence pack the contract specifies for that milestone.

04

Approve

Evidence is reviewed and approved through the approval chain the contract requires. Nothing is implicit.

05

Release

Only after the required approvals can an authorised release instruction be prepared. Live movement remains off.

For the buyer

Capital is not released against an assertion

A release requires accepted evidence and the approvals the contract requires. A milestone that has been claimed but not evidenced does not move money, and the position of every held and released amount is visible in the contract workspace with the provider reference attached.

For the supplier

Commitment controls precede production

The prepared control model requires provider-confirmed commitment before production begins. Live fund flows are disabled, so the current workspace records intended instructions and evidence requirements without representing money as held.

Intended escrow provider

Corpay, subject to the final operating arrangement and activation.

CorpayEscrow partner
Utility-scale solar PV installation
Solar PV

Specifications that stay with the decision.

Model, AC/DC basis, certificates and tolerances remain explicit.

Utility-scale battery energy storage installation
Battery storage

Power and energy, stated separately.

Nominal and usable energy, degradation basis and safety evidence are never assumed.

Built for projects where solar PV is at least 20 MWac or BESS is at least 20 MW, each assessed on its own.

Explore solar PV & BESS
Launching 2027 · Registration open

Build with discipline.
Deliver with evidence.

EnerProcure launches in 2027. Register now, and your organisation is verified and your data room is ready on the day.

Infrastructure & hosting

EnerProcure is built and hosted on infrastructure certified to the following standards.

  • Platform infrastructureISO 27001Information securityCertification held by our platform provider.
  • Platform infrastructureSOC 2 Type IISecurity, availability & confidentialityCertification held by our platform provider.

These certifications cover the infrastructure EnerProcure runs on. They are not certifications held by EnerProcure Limited.

EnerProcure certification roadmap

Where EnerProcure stands today, and what we are working towards.

  • EnerProcureISO 27001Information securityIn progress
  • EnerProcureISO 9001Quality managementIn progress
  • EnerProcureUK GDPRData protectionIn progress
  • EnerProcureEncryptionProvider-managed in transit & at restIn progress

ISO 27001 and ISO 9001 certification for EnerProcure Limited are in progress and neither is held today. The platform runs on infrastructure certified to ISO 27001 and SOC 2 Type II by our platform provider. Encryption in transit and at rest is provided by that platform; access is restricted by organisation and role, and key workflow actions are designed to keep an attributable record. EnerProcure's own data-protection review is in progress.