
Specifications that stay with the decision.
Model, AC/DC basis, certificates and tolerances remain explicit.
One governed record for buyers, suppliers and logistics, from site and specification to sealed tender, contract and delivery. Governance is the advantage: AI proposes, named people decide, and the record shows both.
Launching 2027 · Registration open Our aimMilestone payments in partnership with
Earth imagery: NASA Blue Marble and Black Marble
| Package | From | To | Sea leg | Screening |
|---|---|---|---|---|
| PV modules | East Asia | Demo 120 MWac solar + BESS site (Iberia) | Estimated | Screened, no match |
| BESS containers | North America | Demo 120 MWac solar + BESS site (Iberia) | Estimated | Screened, no match |
| PV modules | South-East Asia | Demo 200 MWac solar site (Atacama region) | Estimated | Possible match under review |
| BESS containers | East Asia | Demo 80 MW / 320 MWh BESS site (Western Australia) | Estimated | Screened, no match |
| PV modules | South Asia | Demo 300 MWac solar site (Arabian Peninsula) | Estimated | Screening pending |
| MV transformers | Central Europe | Demo 100 MWac solar site (Northern Cape) | Estimated | Screened, no match |
| PV modules | South-East Asia | Demo 150 MWac solar + BESS site (US Southwest) | Estimated | Possible match under review |
| PV modules | South Asia | Demo 100 MWac solar site (Northern Cape) | Estimated | Screened, no match |
Procurement teams at EPCs, IPPs and developers source every main package through EnerProcure, from modules and batteries to transformers, switchgear and controls. EnerProcure runs the process; the manufacturers supply the equipment.
Swipe to see all 8
Illustrative photography. Index values are from the illustrative demo feed. Windows without an index open the contract schedule for that equipment.
When an official RFQ goes live it carries the date the equipment is needed on site. A supplier whose lead time cannot meet that date is not invited and cannot send a quotation. Choose the equipment and move the date to see it work.
Official RFQ, live
ExampleTransformers
2
of 6 verified makers
can bid
52 weeksabout 12 months
8 weeks are allowed for shipping. A maker can bid when its lead time plus shipping fits inside the date.
Maker A Verified
Europe · rated 88, outstanding
48 of 52 weeks
Maker B Verified
Asia · rated 81, strong
52 of 52 weeks
Maker C Verified
Middle East · rated 74, strong
needs 70 weeks, 18 too many
Maker D Verified
Europe · rated 92, outstanding
needs 88 weeks, 36 too many
Maker E Verified
Asia · rated 66, sound
needs 112 weeks, 60 too many
Maker F Verified
North America · not yet rated
needs 138 weeks, 86 too many
The makers, their lead times and their ratings are examples, and the audit and rating are being introduced. The date rule is the platform's own.
Governance is the advantage: AI proposes, named people decide, and the record shows both. Every output is advisory, cited and confirmed by a named person.
01Datasheet extraction
ExampleOne value to check Waiting for a person to confirm
Reads a supplier's PDF datasheet into the typed specification for its category, field by field, with a confidence score and the page each value came from.
Never publishes a spec without a person confirming it in the review queue.
Module, storage and material prices, the news that moves them and what is shipping, in one place for procurement teams.
Preview. Prices are an illustrative demo feed and the stories are samples.
Pick a fictional site and size the plant. The demo drafts the RFQ packages, the evidence each supplier must attach and the screening run before award. Quantities are indicative Example and there are no prices.
Draft RFQ · demo
Demo site Iberia
201,628 × Modules · 7,201 strings · 326 FEU
Evidence required
Screening before award
2,401 × Trackers
Evidence required
Screening before award
24 × Inverter stations · 24 × MV transformers (in stations)
Evidence required
Screening before award
40 × DC blocks · 20 × PCS units · 200 MWh
Evidence required
Screening before award
326 FEU · 40 TEU
Evidence required
Screening before award
Run it on a real site with your engineering team.
Follow DEMO-PKG-104, a fictional module package, from requirement to close-out. Bidders appear as aliases, as they do to buyers during a sealed tender. Example
Map sites, packages, bill-of-materials versions, units and evidence requirements before approaching the market.
201,628Modules
2,401Trackers
24Inverter stations
40DC blocks
326FEU · Module containers to move
5 packages, 18 evidence items.
Each package goes to market with its quantities, its units and the evidence a bidder has to supply.
Each step writes to the same record, so a decision taken at tender stays traceable through contract, delivery and close-out.
Structured tenders to scoped suppliers, sealed until the deadline, compared like for like.
EnerProcure vetting and certificate review, kept separate from any payment provider's own checks.
Sanctions and forced-labour list screening, and factory-to-site traceability, recorded with list versions and dates.
Datasheet extraction and a grounded assistant that cite their sources and abstain when the record cannot support an answer.
Awards become versioned contracts with evidence-based milestone schedules.
Plans, serial numbers, inspections and substitutions tied to the awarded lines.
Bookings, delivery slots and site receipts, including part, damaged and rejected deliveries.
Versioned datasheets and certificates shared only with the right organisations.

This fictional example keeps factory evidence, deliveries, dispute holds and approvals against the exact contract version.
An engineering reviewer checks the agreed evidence and accepts, rejects or raises a defect.
Separate authorised approvers review the payment request after technical acceptance.
Sending funds is a separate, final step with the payment partner.
EnerProcure has partnered with Corpay for milestone payments. Live payments open once the escrow mandate and account set-up are finalised; until then the workspace prepares each step without moving money.
The contract records the intended commitment and checks required before production is scheduled.
The intended provider arrangement maps each prepared instruction to named milestones. Activation terms remain unresolved.
The supplier or forwarder submits the evidence pack the contract specifies for that milestone.
Evidence is reviewed and approved through the approval chain the contract requires. Nothing is implicit.
Only after the required approvals can an authorised release instruction be prepared. Live movement remains off.
A release requires accepted evidence and the approvals the contract requires. A milestone that has been claimed but not evidenced does not move money, and the position of every held and released amount is visible in the contract workspace with the provider reference attached.
The prepared control model requires provider-confirmed commitment before production begins. Live fund flows are disabled, so the current workspace records intended instructions and evidence requirements without representing money as held.
Corpay, subject to the final operating arrangement and activation.

Model, AC/DC basis, certificates and tolerances remain explicit.

Nominal and usable energy, degradation basis and safety evidence are never assumed.
Built for projects where solar PV is at least 20 MWac or BESS is at least 20 MW, each assessed on its own.
Explore solar PV & BESSEnerProcure launches in 2027. Register now, and your organisation is verified and your data room is ready on the day.
EnerProcure is built and hosted on infrastructure certified to the following standards.
These certifications cover the infrastructure EnerProcure runs on. They are not certifications held by EnerProcure Limited.
Where EnerProcure stands today, and what we are working towards.
ISO 27001 and ISO 9001 certification for EnerProcure Limited are in progress and neither is held today. The platform runs on infrastructure certified to ISO 27001 and SOC 2 Type II by our platform provider. Encryption in transit and at rest is provided by that platform; access is restricted by organisation and role, and key workflow actions are designed to keep an attributable record. EnerProcure's own data-protection review is in progress.